Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13711516

- Product Categories
- Friendly Links
Information Name: | Hefei Heating renovation / decoration radiator installation process. |
Published: | 2015-06-03 |
Validity: | 0 |
Specifications: | 600-1000 |
Quantity: | 100000.00 |
Price Description: | |
Detailed Product Description: | Decoration radiator installation process and precautions - Yijing From allow you to live a life Yee warm winter home comfort News: need to know about home improvement radiator users can take a look at the installation process. Decoration radiator assembly equipment: household boiler, manifold, pipes, radiators, valves, construction and installation, and DPM. Early pipeline: 1, to determine the position of the radiator and the boiler position, 2, playing the line, grooving, 3, install trap, 4, laying pipe, plug, 5, to suppress, to complete the first phase of construction, 6, system Acceptance of late boiler and radiator installation: 1, drilling, mounting radiators, 2, thermostatic valve and radiator connection, 3, boiler accessories drilling location, 4, install boilers, 5, flue installation, 6, Check the system connection points for leaks, 7, system commissioning and acceptance, 8, to the customers operating and precautions, home improvement is above the radiator of the construction and installation process. Early Notes: position of general in the kitchen boiler, radiator position is generally a room a group identified for the correct position, manifold general in the cabinet below the kitchen or in the bathroom, grooving to pipelay smooth vertical and horizontal, corner for an arc, typically 6 kg hydrostatic pressure, final inspection plug and manifold leaks, the system is normal, acceptance, ended. Late Note: when installing radiators need to be careful, to stabilize the radiator after the installation is complete, you can not appear to waver, the valve is not leaking joints phenomenon. When the boiler installation location must be accurate, otherwise the link bellow place very ugly, and bellows connected to stabilize, not seepage, the final installation should seal the chimney is good, otherwise there will be flavor of the exhaust gas system again after passing inspection Careful, detailed handed users. Described above is the installation process and cautions decoration radiator, and hope you have a good look, will certainly help you. This version comes from - Hefei Yee-being of Equipment Co., Ltd. |
Admin>>>
You are the 18463 visitor
Copyright © GuangDong ICP No. 10089450, Hefei Yee heating equipment Co. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 18463 visitor
Copyright © GuangDong ICP No. 10089450, Hefei Yee heating equipment Co. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility