Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13711516

- Product Categories
- Friendly Links
Information Name: | Warm Price / floor heating installation / on home improvement to warm Notes / |
Published: | 2015-05-12 |
Validity: | 0 |
Specifications: | |
Quantity: | 1000.00 |
Price Description: | |
Detailed Product Description: | Floor heating installation steps and precautions ---- Yee Yee professional commentary comfortable home Reuters: in many home heating systems to warm heating systems are popular, heating no dead ends, no dust, no noise, the most important It is to bring the foot feeling very high degree of comfort, warm feet and cool head - promote blood circulation - was in line with Chinese saying, for rheumatism elderly has a great advantage. Since warm so well, following the author is said to warm the installation of step bars. Warm: 1, the first to use the sand to ground surfaces clean. 2, first laying a layer of reflective film on the ground. 3, the insulation board laying on the ground, while the external wall insulation corners well. 4, insulation board on top of a reflective film. Note (reflective film laying two layers) 5, laying barbed wire on top of the reflective film. 6, above barbed wire laying heating pipes. 7, to warm the pipe is fixed directly Cardin. 8. Finally, the expansion joint laying work can be done. 9, after the completion of the laying warm pressure test - carried heating system packing, to complete. 10, after packing the day after the completion of the night, to warm the system to normal after packing (packing if abnormal please contact warm company), for leveling work, (or leveling tiles were together), heating system laying so complete a. Warm Note: 1, reflective film reflective film material with a non-woven fabric is correct. 2, insulation board materials for higher-density, thickness 2 cm. 3, barbed wire work primarily for leveling with fixed and pitch vary. 4, to warm the pipe material generally used pert, plastic composite pipe, pexc, with its 15 cm spacing (12/16), note bending curvature of magnitude at the bend. 5, usually 6 cm corner insulation, expansion joints used in the dining room area of ??more than 20 square before laying. 6, floor heating system packing work must be frequently observed, abnormal please contact warm company. 7, warm wooden floors and the subsequent leveling tile thickness is not the same height above the wooden floor leveling duct 2 cm above the floor tile leveling height above the pipe 0.1-0.3 to late stick tile and wooden floors coordinated thickness, height reach consensus. (Wood floor and tile thickness selection may be). The above is the construction steps and precautions to warm up, Yee-being published in Hefei, Hefei warm company, specializing in the warm company, design, installation, construction, maintenance and after-sales service one-stop cordial, Fairview comfortable home - warm thousand 10000. Hefei Yee-being of Equipment Co., Ltd. |
Admin>>>
You are the 18463 visitor
Copyright © GuangDong ICP No. 10089450, Hefei Yee heating equipment Co. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 18463 visitor
Copyright © GuangDong ICP No. 10089450, Hefei Yee heating equipment Co. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility